Figure 19. Replacing the holder back onto the carrier
12. Repeat from step 10 on page 11 for each cold plate.
13. After all the cold plates are attached to the cold plate installation carrier, lift the carrier straight up
off the system as shown in Figure 20 on page 16. If you lift at an angle, the carrier catches on the
cold plate clips.
Removing and replacing parts in the IBM Power System S822LC (8335-GTB)
15