Installing The Extended Cable Manager Top Hat - Juniper MX960 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Figure 88: Sliding the Original Top Hat Completely Out of the Chassis

Installing the Extended Cable Manager Top Hat

To install the extended cable manager top hat in the chassis, follow this procedure (the top hat weighs
(40 lbs [18 kg]):
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Lift the top hat into place over the top of the chassis and rest it on the flanges along the side panels of
the chassis (see
Figure 89 on page
302).
301

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents