Installing The Interface Module Cage Cover Center-Mount Brackets - Juniper MX960 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX960:
Table of Contents

Advertisement

Figure 69: Upper Fan Tray Cover and Optional ESD Grounding Jack

Installing the Interface Module Cage Cover Center-Mount Brackets

The interface module cage cover is installed directly over the interface module cage. The installation of
the brackets depends on whether the router is center or front mounted.
To install the center-mount brackets for the interface module cage cover on routers that are center
mounted, use the following procedure (see
1. Locate the tab on the rear surface of the mounting bracket.
2. Place the rear surface of the bracket against the mounting flange. Vertical alignment is correct when
the tab rests on top of the flange.
3. Locate the highest available mounting hole on the bracket and insert the first screw through the bracket
and flange. Secure it with a nylock nut.
4. Locate the lowest available mounting hole on the bracket and insert the second screw through the
bracket and flange. Secure it with a nylock nut.
5. Use a screwdriver and a wrench to hand tighten the screws and nylock nuts. Do not overtighten the
screws. Overtightening may cause damage to the plastic bracket.
6. Repeat the above steps with the second bracket.
Optional ESD grounding jack
Figure 70 on page
281).
280

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents