330
Figure 111: Reinstalling an FPC
Reinstalling the Standard Cable Manager After Installing an MX960 Router with a Lift
To reinstall the standard cable manager (see
Figure 112 on page
331):
1. Wrap and fasten one end of the ESD grounding strap around your bare wrist, and connect the other
end of the strap to the ESD point on the chassis.
2. Position the cable manager on the studs on the lower front of the chassis.
3. Insert the nuts on the corners in the cable manager onto the studs on the chassis.
4. Using a 7/16-in. (11 mm) nut driver, tighten the nuts securely.