Power Up Core Cards; Restore Power; Cs 1000 Release 7.5 Upgrade - Avaya 1000M Upgrade

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 84 of 212
Performing the upgrade

CS 1000 Release 7.5 upgrade

NN43021-461
Standard 06.03

Power up Core cards

Procedure 21
Powering up core cards
1
For AC-powered systems (NT8D29BA): set the MPDU circuit breaker
located at the left end of the module to ON (top position).
2
For DC-powered systems: faceplate-enable the NT6D41CA power supply
and then set the breaker for the Core 1 module in the back of the column
pedestal to ON (top position).

Restore power

Procedure 22
Restoring power
1
Restore power to Core/Net 1.
2
Wait for the system to load/initialize.
3
Check that the Network and I/O cards have working power.
System is in split mode, CP 0 is active, clock 0 is active,
all network cards in shelf 1 are software disabled.
Upgrading the software
Procedure 23 outlines the steps involved in installing CS 1000 Release 7.5
for the CP PIV processor.
June 2014
End of Procedure
End of Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents