Avaya 1000M Upgrade page 177

Cs 1000m sg cp piv
Table of Contents

Advertisement

lnstalling a Signaling Server
Page 175 of 212
Figure 44
Installed Ethernet port adapter plate
11 Attach the ferrite beads to the Ethernet patch cables.See Figure 45.
61C to CS 1000M SG CP PIV Upgrade

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents