Preparing and planning for the upgrade
NN43021-461
Standard 06.03
Identify all applications that are currently installed on the source
platform.
Identify and correct outstanding service problems.
Verify the site log is updated with current trunking, call routing,
application notes, and site contact information.
Review all product bulletins and Avaya Alerts that impact the site.
Determine if software can be converted on site or must be sent to Avaya.
Prepare a contingency plan for backing out of the upgrade.
DANGER OF ELECTRIC SHOCK
In a DC-powered system, power to the column can
remain on during the following procedures. In an
AC-powered system, however, power to the entire
column must be shut down throughout the procedures.