Avaya G350 Installing And Upgrading page 109

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Figure 26: G350 NVRAM INIT Jumper Location
Figure notes:
1. NVRAM INIT jumper
6. Bridge jumper JP18 (refer to
7. Reconnect the G350 to the electricity supply.
- The PWR LED on the front panel lights. The CPU LED lights up if the firmware is
running.
8. Disconnect the power cord from the power receptacle on the rear panel of the G350.
9. Remove the bridge.
!
Important:
If you do not remove the bridge, the G350 will continue to initialize the NVRAM
Important:
when it resets or is powered up.
10. Re-insert the media modules or slot covers in slots V3, V4 and V5.
11. Replace the G350 in the rack if applicable.
12. Reconnect the cables to the media modules.
13. Connect the power cord to the power receptacle on the rear panel of the G350.
1
Figure
26) using the bridge provided in the accessory kit.
NVRAM Init
Issue 7 November 2009
109

Advertisement

Table of Contents
loading

Table of Contents