Xerox WorkCentre Pro 423 Service Manual page 436

Hide thumbs Also See for WorkCentre Pro 423:
Table of Contents

Advertisement

Be sure to secure the IOT with the brackets to prevent its fall.
5. Reinstall the Tray 1 removed when unpacking the IOT.
6. Mount the IIT on the IOT.
The weight of the IIT assembly is 24 kg (53 lb). Two persons will be required to lift this
assembly. Use great care when lifting.
7. Secure the IIT and IOT. (Figure-7)
1 Tighten the Screw.
Ensure that the IIT is secured with the Screw to prevent the IIT from falling.
8. Connect the 2-Tray Module connector to the IOT connector. (Figure-8)
1) Remove the Right Cover Cap B.
2) Connect the connector. (The light blue end should be on the right side.)
Note
Make sure that the connector is connected securely. A contact failure will cause
a paper detection error at Trays 2 to 4.
WorkCentre Pro 423/428
CAUTION
WARNING
(Figure-7) j0hn6507
CAUTION
03/02
6-19
(Figure-8) j0hn6508
CHAPTER 6 GENERAL
Contents

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre pro 428

Table of Contents