Genie GS-2669 DC Service And Repair Manual page 77

Serial number range from gs6912-1300/from gs6916f-7897 to gs6916f-10499/from gs69f-10500
Hide thumbs Also See for GS-2669 DC:
Table of Contents

Advertisement

Service and Repair Manual
Manifolds
How to Adjust the Platform Up
Relief Valve - Models with
Proportional Relief, without
Platform Overload
Note: Verify the hydraulic oil level is within the top 2
inches / 5 cm of the sight gauge.
1
Connect a 0 to 5000 psi / 0 to 350 bar
pressure gauge to test port #1 (TP1) on the
function manifold.
1 platform up relief valve
2 test port #1
2
Using a suitable lifting device, place and
secure the maximum rated load in the center
of the platform deck.
GS-2669
GS-3369
GS-4069
3
Press and hold the lift function enable button
and platform up button. Allow the platform to
raise completely, then continue activating the
lift function while observing the pressure
reading on the pressure gauge. Note the
66
1500 lbs / 680 kg
1000 lbs / 454 kg
800 lbs / 363 kg
GS-2669 DC • GS-3369 DC • GS-4069 DC
pressure. Refer to Specifications,
Component Specifications
4
Hold the lift relief valve with a wrench and
remove the cap.
5
Adjust the internal hex socket. Turn it
clockwise to increase the pressure or
counterclockwise to decrease the pressure.
Install the relief valve cap.
Tip-over hazard. Failure to adjust
the relief valves to specification
could result in the machine
tipping over, causing death or
serious injury. Do not adjust the
relief valve pressures higher
than specifications.
Repeat this procedure beginning with step 3 to
confirm the relief valve pressure.
6
Lower the platform to the stowed position.
7
Using a suitable lifting device, remove the
weight from the platform.
November 2016
Hydraulic
.
Part No. 1272220GT

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-4069 dcGs-3369 dc

Table of Contents