Powering
Physical installation check
Overview
...................................................................................................................................................................................................................................
Purpose
A complete physical installation check should be done to ensure that all components
are complete and the cables are connected correctly.
Checks
The following units should be checked:
• Unit installation
• Cable connections.
The tests mentioned above are described in more detail in the following topics.
Contents
AM/AMS unit installation
Cable connections
Physical and power installation exit checklist
...................................................................................................................................................................................................................................
365-312-802R7.2
Issue 4, June 2007
Alcatel-Lucent - Proprietary
See notice on first page
5-6
5-7
5-8
5-5