Alcatel-Lucent 1643 AMS Installation Manual page 161

Access multiplexer / access multiplexer small (formerly metropolis am / metropolis ams) release 1.0 through 7.2
Hide thumbs Also See for 1643 AMS:
Table of Contents

Advertisement

Powering
Physical installation check
Overview
...................................................................................................................................................................................................................................
Purpose
A complete physical installation check should be done to ensure that all components
are complete and the cables are connected correctly.
Checks
The following units should be checked:
• Unit installation
• Cable connections.
The tests mentioned above are described in more detail in the following topics.
Contents
AM/AMS unit installation
Cable connections
Physical and power installation exit checklist
...................................................................................................................................................................................................................................
365-312-802R7.2
Issue 4, June 2007
Alcatel-Lucent - Proprietary
See notice on first page
5-6
5-7
5-8
5-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1643 am

Table of Contents