P owering
Overview
...................................................................................................................................................................................................................................
Purpose
This chapter describes the powering of the 1643 AM/AMS system and some final tests
which should be performed to end the physical installation part.
Assumption
All units/network elements (NEs) must be mounted and cabled correctly (see Chapters
3 and 4).
Contents
Power initialisation
Switching on and testing supply voltage
Fan unit test
Physical installation check
AM/AMS unit installation
Cable connections
Physical and power installation exit checklist
...................................................................................................................................................................................................................................