Siemens SINAMICS S110 Manual page 107

Hide thumbs Also See for SINAMICS S110:
Table of Contents

Advertisement

Figure 4-23
Figure 4-24
Figure 4-25
Note
The short leading edges of the duty cycles shown can only be achieved using speed or
torque control.
SINAMICS S110
Manual, 07/2015, 6SL3097-4AC10-0BP5
S6 peak current duty cycle with initial load (for servo drives)
Duty cycle with 60 s overload with a duty cycle duration of 300 s
Duty cycle with 30 s overload with a duty cycle duration of 300 s
Blocksize Power Modules (PM240-2)
4.6 Technical data
107

Advertisement

Table of Contents
loading

Table of Contents