Figure 11-1. Removing Or Installing A Power Supply - Nortel Passport 5430 Installing And Operating Instructions

Multiservice access switch
Hide thumbs Also See for Passport 5430:
Table of Contents

Advertisement

Installing and Operating the Passport 5430 Multiservice Access Switch
Grasp the handle and push the power supply into the slot along the side
3.
guides, and gently insert the supply
Figure 11-1.
Removing or Installing a Power Supply
Using a flat-tip screwdriver, tighten the captive screw until the power
4.
supply is seated firmly.
When you insert an operational second power supply into the Passport 5430
with the power on, the PS2 LED on the system processor module turns on. At
the same time, the Passport 5430 automatically redistributes the load between
the two power supplies.
Connect the power cable to the Passport 5430.
5.
For instructions, see "Connecting to the AC Power Source" on page 4-16.
Turn on the power switch on the power supply.
6.
For instructions, see "Turning the Passport 5430 On and Off" on page 6-9.
11-2
PS1
DC OK
100-240V~ 50-60Hz 25A
Captive screw
(Figure
11-1).
DC OK
100-240V~ 50-60Hz 25A
PS2
FBR0009A
306308-A Rev 00

Advertisement

Table of Contents
loading

Table of Contents