Maintenance; Maintenance Schedule - Graco PGM Instructions - Parts Manual

Precision gear metering
Hide thumbs Also See for PGM:
Table of Contents

Advertisement

Maintenance

Maintenance
Prior to performing any maintenance procedures, follow
the Pressure Relief Procedure on page 26.

Maintenance Schedule

The following tables list the recommended maintenance procedures and frequencies to operate the equipment
safely. The maintenance is divided between mechanical and electrical tasks. Maintenance must be performed by
trained personnel per this schedule to assure safety and reliability of the equipment.
Mechanical
Task
Inspect system for leaks
Depressurize fluid, after opera-
tion
Remove heat from system,
after operation
Inspect filter (234967) bowls
and drain
Check hoses for wear
Check/tighten fluid connections
Check/tighten air connections
Lubricate dispense valves*
Replace gear meter seals
Rebuild dispense valve*
Replace air filter
Replace Solenoid
Replace gear meter drive shaft
Replace gear head
* Check component manual for more detailed maintenance information.
Electrical
Task
Check cables for wear
Verify cable connections
Verify operation of "System Stop" button
* Check Component Manual for more detailed maintenance information.
34
Operator
Daily
Weekly
Weekly
Maintenance Person
3-6
Monthly
months
or
125,000
cycles
18-24
36-48
months
months
or
or
500,000
1,000,000
cycles
cycles
As
Required
3A5185B

Advertisement

Table of Contents
loading

Table of Contents