Mitsubishi MELSEC-F User Manual page 112

Hide thumbs Also See for MELSEC-F:
Table of Contents

Advertisement

5 COMMUNICATION PROCEDURE
5 - 38
(2) When "Do not wait for OPEN" is selected in the operational setting
When initial timing settings of operational settings are at [Do not wait for OPEN
(communication impossible at STOP time)], the (BFM #24 b8: OFF) open
processing/close processing is performed as explained below.
Since open processing/close processing is executed by a sequence program, an
external device can be changed while the connection is established.
M8000
0
U1\
G27
[=
H1
Initial
completion
signal
X000
M0
M103
12
Open
Initial
Cancel of
request
completion
self-
status
holding
at close
M100
Open request
(Self-holding)
[=
[=
[=
[=
X000
Open
request
M102
Closed
(Self-
holding)
79
User applications are described at the area enclosed with
]
D100
H3
]
Reading
value
of #1602
D100
H5
]
Reading
value
of #1602
D100
H10
]
Reading
value
of #1602
D100
H15
]
Reading
value
of #1602
[=
D100
H0
]
Reading
value
of #1602
.
MELSEC-F
X0:ON Open
X0:OFF Close
U1\
[MOV
G28
K4M110 ]
Status Read of status
(M0
Initial
completion
status
(M100
)
Open
request
(Self-
holding)
U1\
[MOV
G1602
D100
]
Reading
OPEN
value
instruction/
of #1602
status
U1\
[MOVP
H1
G1602
]
OPEN
instruction/
status
(M101
)
Rissn/Open
completed
[INCP
D0
]
Number of normal open completions
Normal open
[INCP
D1
]
Number of
abnormal
open
completions
U1\
[MOVP
H8000
G1602
]
OPEN
instruction/
status
(M102
)
Closed
(Self-
holding)
(M103
)
Cancel of
self-holding
at close
[INCP
D2
]
Close normal completion count
Close normal processing
[END
]
5 - 38

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fx3u-enetFx3uc-enet

Table of Contents