How To Install Or Remove A Switch Fabric Card; Installing A Switch Fabric Card - Cisco ASR 14000 Series Installation Manual

Router 8-slot line card chassis
Hide thumbs Also See for ASR 14000 Series:
Table of Contents

Advertisement

How to Install or Remove a Switch Fabric Card

Figure 4-17
Step 3
Remove the lower left screw (located below the pillow block pin). (See item number 3 in
Remove the top left screw (located above the pillow block pin). (See item number 4 in
Step 4
Remove the pillow block and set it aside.
Step 5
Repeat this procedure for the card slot's other pillow block if necessary.
Step 6
What's Next
After performing this task, you may install a new pillow block (see the
section on page
How to Install or Remove a Switch Fabric Card
This section contains the following procedures:

Installing a Switch Fabric Card

This section describes how to install a switch fabric card in the Cisco ASR 14000 series 8-slot line card
chassis. For more detailed information on the switch fabric card, see Cisco ASR 14000 Series Router
8-Slot Line Card Chassis System Description.
Cisco ASR 14000 Series Router 8-Slot Line Card Chassis Installation Guide
4-24
Removing a Pillow Block
4
3
4-21).
Installing a Switch Fabric Card
Removing a Switch Fabric Card
Verifying the Installation of a Switch Fabric Card
Chapter 4
Installing and Removing MSCs, PLIMs, and Associated Components
1
2
Figure
4-17.)
Figure
4-17.)
"Installing a Pillow Block"
OL-16973-01

Advertisement

Table of Contents
loading

Table of Contents