Table Of Contents - Cleveland steamcraft 21-CET-8 Service Manual

Counter type convection steamer
Hide thumbs Also See for steamcraft 21-CET-8:
Table of Contents

Advertisement

CHAPTER
CHAPTER 1. PRODUCT IDENTIFICATION.........................................................................1
MODEL NUMBER.................................................................................................1
SERIAL NUMBER.................................................................................................1
PRODUCT INFORMATION PLATE...........................................................................1
CHAPTER 2. INSTALLATION INSTRUCTIONS.....................................................................3
INTRODUCTION...................................................................................................3
INSTALLATION POLICIES.......................................................................................3
INSTALLATION OVERVIEW....................................................................................4
PREPARATION FOR INSTALLATION........................................................................6
Electric Power Requirements...........................................................................6
Water Quality Requirements...........................................................................6
Selecting The Operating Location.....................................................................7
INSTALLATION INSTRUCTIONS.... ..........................................................................9
Unpacking and Inspection...............................................................................9
Position and Level The Steam Craft 3.1...........................................................10
Install the Free Air Vented Drain Lines..............................................................14
Connect Drain Line.......................................................................................16
Install Electric Power Lines............................................................................16
Connect Electrical Line.................................................................................17
Install Water Supply Lines.............................................................................18
Connect Water Supply Lines..........................................................................20
Testing Water Supply Lines...........................................................................21
Final Setup and Checkout.............................................................................22

TABLE OF CONTENTS

Water Supply System...........................................................................7
Shipping Damage Instructions..............................................................10
Leg Mounting and Leveling..................................................................10
Surface Mounting and Leveling.............................................................11
Stand Mounting and Leveling................................................................12
Install Slide Racks..............................................................................14
General Connection Requirements........................................................21
Untreated Water Connection (Without SteamerGard)................................21
Treated Water Connection (With SteamerGard).......................................21
Operating Tests - Key Pad Control Panel..............................................24
Operating Tests - Dial Timer Control Panel............................................26
Model 21-CET-8 Service Manual
Page I
PAGE
Printed 12/90

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents