INSTALLATION OVERVIEW

Table 2-1. Installation Check List
TASK
Preparation
Check Electric Power Requirements
Test Supply Water Quality
Select Water Supply System
Install Water Treatment System
Select Operating Location
Installation
Unpack And Inspect SteamCraft 3.1
Position And Level Steamer
Install And Connect Drain Line
Install And Connect Electrical Lines
Install And Connect Water Supply Lines
Test Water Supply Lines
Perform Final Setup And Checkout
• This equipment is designed and certified for safe operation only
when permanently installed in accordance with local and/or national
codes. Many local codes exist, and it is the responsibility of the
owner and installer to comply with these codes.
• In no event shall the manufacturer assume any liability for damage
or injury resulting from installations which are not in strict
compliance with the Installation Instructions and the codes cited
above. Specifically, the manufacturer will not assume any liability for
damage or injury resulting from improper installation of equipment,
including, but not limited to, temporary or mobile installations.
Schematic Installation Diagram, Figure 2-1, illustrates the various drain,
electrical, and water lines required; and their connection points on the
SteamCraft 3.1. Table 2-1, Installation Check List, outlines the overall
installation process in a recommended sequence; the instructions refer-
enced provide details. Installation requirements may vary from site to
site; adapt the check list accordingly.
PAGE
REFERENCE
6
7
7
7
7
9
10
14-16
16-18
18-21
21
22
COMPLETED