Statement of Responsibilities
This document is for use by experienced and trained Qualified Cleveland Range, LLC Authorized Service
Representatives who are familiar with both the safety procedures, and equipment they service.
Cleveland Range, LLC assumes no liability for any death, injury, equipment damage, or property damage
resulting from use of, improper use of, or failure to use the information contained in this document.
Cleveland Range, LLC has made every effort to provide accurate information in this document, but
cannot guarantee that this document does not contain unintentional errors and omissions.
The information in this document may be subject to technical and technological changes, revisions, or
updates.
Cleveland Range, LLC assumes no liability or responsibility regarding errata, changes, revisions, or
updates.
Qualified Cleveland Range, LLC Authorized Service Representatives are obligated to follow industry
standard safety procedures, including, but not limited to, OSHA regulations, and disconnect / lock out /
tag out procedures for all utilities including steam, and disconnect / lock out / tag out procedures for gas,
electric, and steam powered equipment and / or appliances
All utilities (gas, electric, water and steam) should be turned OFF to the equipment and locked out of
operation according to OSHA approved practices during any servicing of Cleveland Range equipment
Qualified Cleveland Range, LLC Authorized Service Representatives are obligated to maintain up-to-date
knowledge, skills, materials and equipment.

Advertisement

loading

Summary of Contents for Cleveland 24-CSM

  • Page 1 Statement of Responsibilities This document is for use by experienced and trained Qualified Cleveland Range, LLC Authorized Service Representatives who are familiar with both the safety procedures, and equipment they service. Cleveland Range, LLC assumes no liability for any death, injury, equipment damage, or property damage resulting from use of, improper use of, or failure to use the information contained in this document.
  • Page 2 Cleveland Range, LLC 1333 East 179th St., Cleveland, Ohio, U.S.A. 44110 Ph: 1-216-481-4900 Fx: 1-216-481-3782 Visit our Web Site at www.clevelandrange.com...
  • Page 3 7. Water continues to fill until the high probe is grounded. When the high probe is grounded the WF terminal on the water level board is de- energized. The fill solenoid closes until the high probe is ungrounded for 05 seconds. CLEVELAND RANGE SEQUENCE OF OPERATIONS Steam Coil Boiler Base...
  • Page 4 If the water level drops below the high probe for more than 20 seconds the WF terminal is energized and the water fill circuit begins again. 8. When the unit is turned off, by depressing the red rocker switch, 115 VAC is removed from the heat circuit. 115 VAC is removed from the drain circuit and the normally open drain valve opens allowing the unit to drain.
  • Page 6 The operating pressure switch opens and the heat circuit is de-energized. When the pressure drops below the set point the heat circuit is energized and the heat process begins again. 7. Water continues to fill until the high probe is grounded. CLEVELAND RANGE SEQUENCE OF OPERATIONS Steam Coil Boiler Base...
  • Page 7 When the high probe is grounded the WF terminal on the water level board is de- energized. The fill solenoid closes until the high probe is ungrounded for 05 seconds. If the water level drops below the high probe for more than 20 seconds the WF terminal is energized and the water fill circuit begins again.
  • Page 9 PROBLEM: Steam Coil Boiler won't build pressure Steamer won't fill. Replace the water board Is there 120 VAC between terminals Repair L2 and HTR on the or Replace the water board with a probe circuit. jumper between Low and C? Replace the latching relay Boiler won't build...
  • Page 10 PROBLEM: Steam Coil Boiler won't fill Replace the wiring to the fill solenoid. Replace the fill solenoid Does the steamer have Replace wiring the optional to drain intermittent solenoid. blowdown timer? Replace the there 120 VAC wiring to the between terminals intermittent 2&3 on the timer? blowdown...
  • Page 11 PROBLEM: Steam Coil Boiler Over Pressurizes Replace (15# Safety operating pressure valve opens) switch Replace the safety valve. Steam Coil Boiler Stops Producing Steam Boiler stops steaming Replace Does the amber operating light in the reset pressure switch come on? switch.
  • Page 12 PROBLEM: Steam Coil Boiler Overfills Boiler over fills With the HI probe emersed in water is there 120 VAC Replace the fill between terminals solenoid L2 and W F on the water board.? Replace 3 minute timer With a jumper With the wire across terminals removed from...