Stand Mounting And Leveling - Cleveland steamcraft 21-CET-8 Service Manual

Counter type convection steamer
Hide thumbs Also See for steamcraft 21-CET-8:
Table of Contents

Advertisement

Page 12
Model 21 -CET-8 Service Manual
Figure 2-9. Counter Top
Mounting Hardware
Figure 2-10. Sanitary Counter Top
Seal
INJURY AND EQUIPMENT DAMAGE
from improper lifting. The SteamCraft 3.1 weighs
approximately 135 pounds. Use enough workers with
experience lifting heavy equipment to place the
SteamCraft 3.1 on the counter.
4. Lift the SteamCraft 3.1 into position on the counter and align the steamer
mounting holes with the counter mounting holes. The steamer mounting
holes are the holes with the 3/8"-16 weldnuts usually used to mount the
adjustable legs.
NOTE: If there is not enough clearance behind the steamer to install the drain,
electrical, and water lines; skip the remainder of this procedure and
go to page 14, Install the Free Air Vented Drain Lines. After installing
all necessary drain, electrical, and water lines, proceed with step 5 of
these instructions and mount the steamer to the counter top.
5. Install 3/8"-16 mounting screws and washers as shown in Figure 2-9. The
screws should be long enough to pass through the washer, counter,
shims, and weldnut without projecting more than 1/2 inch above the
weldnuL Thread the screws only a few turns into the weldnuts, leaving
enough play for leveling the unit and sealing the mounting holes.
6. Do not shim at the highest comer (marked in step 2). Shim the other three
comers until the unit is level both front to back and side to side.
7. Inject enough silicone sealant into each mounting hole in the counter to
seal the bole as the hardware is tightened.
8. Tighten the mounting hardware enough to secure the unit in place but not
change the level After hardware is tightened, verify that the SteamCraft
3.1 is level front to back and side to side.
9. Seal the gap between the SteamCraft 3.1 and the counter top. Lay a
generous bead of silicone sealant under the entire perimeter of the
steamer bottom. See Figure 2-10.
10. Smooth the silicone seal into the crevice with finger or tool to provide a
cove seal
11. After the SteamCraft 3.1 has been positioned and leveled, refer to page
14, and install the slide racks.

Stand Mounting and Leveling

The Cleveland Range ES-2130 Equipment Stand provides a stable, level
mounting base for the SteamCraft 3.1. In addition, the stand has a slide-away
work surface, and storage for five cafeteria trays. When mounting a
SteamCraft 3.1 on the ES-2130, first install and level the stand, then surface
mount the steamer to the top of the stand. Because the stand is level and
designed to support the SteamCraft 3.1, it is not necessary to place shims or
seals between the stand and steamer.
WARNING
could result

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents