Installation Work Flow - Konica Minolta DRYPRO 771 Installaton Manual

Table of Contents

Advertisement

Ch.1 Before Installation
1.1

Installation Work Flow

In order to ensure the smoothest possible work flow, tasks should be carried out in the sequence shown
below.
Removal of protective materials (red components)
Connection of power supply and network cables
Installation of UPS battery (recommended).(option)
Install an exhaust duct, cable protection parts. (option)
Making DRYPRO 771 settings (SCP) "S00"
Making settings on connected diagnostic devices (SCU) "S10"
DRYPRO MODEL 771 INSTALLATION MANUAL Ver.1.00 2003.10
Preparations
· Installation conditions check
· Network check
· Tool preparation
Installation
Unpacking
Installation of deodorant filter
Check of film size to be used
14x17
Changing tray film size
Making Settings
Starting up the DRYPRO 771
Making other settings "S20," "S30," "S40"
Settings user LUTs
Density correction
Checks
Test Printing
14x14
14x11