Signature Command Operating Instructions; Features; Battery Installation; System Configuration/Setup - Vermont Castings Radiance RADVTSCCB Installation And Operating Instructions Manual

Radvt series direct vent gas heater
Hide thumbs Also See for Radiance RADVTSCCB:
Table of Contents

Advertisement

SIGNATURE COMMAND OPERATING INSTRUCTIONS

FEATURES

Command Center (Figure 57)
• Easy Access Function Operation and System Config-
uration
• Operation Confirmation/Fault Diagnostic Indications
(LED/Buzzer)
• ON/OFF/HI/Med/Low Operation
• Optional Wall Mounting
Control Board
• Electronic Ignition
• Pilot Lockout safety feature
• Electric Power Regeneration from Thermopile to save
battery
• 6-hour Automatic Shut Down Option
• Convenient NG/LP Gas Type Conversion
• Standing Pilot/Intermittent pilot Conversion
• Previous settings Restoration Ability (Memory Off)
• Uninterrupted Operation During Power Outage (Auto-
matic Battery Backup)
• ON/OFF RF Remote Receiver
• Optional Transmitter Learn Capability
AC Module (Requires TSFSC Remote)
• Easy Snap-on Design
• Embedded Compact 120 VAC Adapter with Auto Bat-
tery Back up Feature
• Remote Controlled 3-step Blower, Lighting, and On/Off
Auxiliary AC Outputs
Transmitter (TSFSC)
• Three Flame Height Settings
• Low battery Indication for Transmitter
• Child Proof Lock-out
• LCD Backlight
• Security Codes (16)
• Countdown 6 hr Timer
• Standard Thermostatic Control Mode
• Smart Mode® Thermostat
tion)
• Three Brightness Settings for Lights
• Three Speed Control for Blower
• On/Off Auxiliary
• Programmable Timer to turn blower on and off
3636
(Auto Flame & Blower Modula-
Radiance
RF Receiver
ON/OFF
NG/LP
Conversion
Control
Board
ON
Master Switch
LED
OFF
Battery Door
Command
Center
Fig. 58 Signature Command System Components

BATTERY INSTALLATION

The Command Center uses four (4) "AA" batteries as
FP1917
back up for power outages. The system can operate for
Signature components
approximately six (6) months on battery power.
8/08
To Install Batteries (not included):
1. Press down the battery door tabs and pull out to re-
move battery door.
2. Install the batteries as indicated on Command Center.
3. Close battery door by snapping in place.
4. When the four (4) batteries are installed the system
will operate without power.
5. The batteries should be replaced when the LED indi-
cates low battery or at least once a year.
Direct Vent Gas Heater
®
To Thermopile
To Sensor
To Sparker
To Command
Center
To Stepper Motor
To Valve
AC Module
FP1917
20306759

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents