Junction Box Wiring; Command Center Wall Installation; Wall Switch Installation - Vermont Castings Radiance RADVTSCCB Installation And Operating Instructions Manual

Radvt series direct vent gas heater
Hide thumbs Also See for Radiance RADVTSCCB:
Table of Contents

Advertisement

Radiance
Direct Vent Gas Heater
®

JUNCTION BOX WIRING

This should be done before framing the stove. Wire the
receptacle into an electrical circuit. Wire with minimum
60° C wire in accordance with prevailing codes.
Remove the external junction box cover by removing the
screw from the side of the outside firebox wall. Junction
box was installed at the factory.
The junction box cover has a factory installed "romex" style
strain relief connector. After connecting the wires, route
the wire leads through this connector. Refer to the wiring
diagram in Figure 49.
Junction Box
Fig. 49 Junction Box Wiring Diagram

COMMAND CENTER WALL INSTALLATION

The command center may be mounted on the wall with
FP1912
the use of the SCSWEK Kit (15ft. cable, junction box, wall
cover).
Junction box wiring
Mount the junction box provided at the desired lo-
8/08
cation on the wall. Do not extend beyond the 15 ft.
wire cable provided. If a longer distance is required,
the 15 ft. may be extended up to 30 ft. maximum by
using two (2) SCSWEK cables plugged together.
Route the wire from junction box to lower control area
at bottom of stove. Unplug the 12" cable from the com-
mand center. Attach the connector to the pins from wire
by pushing in to connector making sure to follow the color
code on connector. Plug the 15 ft. extension cable into
the 2 ft. cable. Remove command center from the stove
and plug the other end of the extension cable into the
command center. Snap on wall cover provided and screw
to junction box.

WALL SWITCH INSTALLATION

The wall switch wire connection is located off the 2 ft. wire
harness from the control box to the command center. Figure
52. The connection is labeled "Wall Switch". Unplug the
male and female connectors and connect the two (2) low
voltage wires provided. Run wire to desired location on
wall. Up to 50 ft. of 18 ga. wire may be used if necessary.
Attach wires to wall switch. Mount the wall switch in to
junction box and screw on cover.
WARNING
Do not connect wall switch to 110 V circuit.
20306759
Install the Fan - RADVTSC Models
It is easiest to install the fan kit before connecting a gas line.
120V AC
60Hz
Factory Supplied
Not Supplied
Fig. 51 Secure Blower assembly to lower back of the stove.
ASSEMBLY AND INSTALLATION
CAUTION
Electrical connections should only be performed by a
qualified, licensed electrician. Main power supply must
be turned off before connecting fans to the main elec-
trical power supply or performing service.
WARNING
Electrical Grounding Instructions: This appliance is
equipped with a three-prong (grounding) plug for your
protection against shock hazard and should be plugged
directly into a properly grounded three-prong receptacle.
Unpack and inspect the blower assembly. Confirm
that the fan spins freely.
Unfasten the two machine bolts attached to the lower
back of the stove. Figure 51
Using the two bolts secure the blower assembly to
the rear of the stove. Figure 51
Connect the blower wires to the wire control board.
See Figure 53 on page 29.
Blower
Assembly
Fig. 50 RADVTSC Blower assembly
ST473a
Fan parts
#2767 FK26
9/29/00
ST147ED
RDV40 remove rear shroud
ST473aED
ST147
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents