GMC 1976 ZEO 6083 Maintenance Manual page 831

Table of Contents

Advertisement

HOLDING TANK AND DRAINAGE SYSTEM
24L- 5
1 . Hose Storage Tube
2 . Spare Tire Carrier
3 . Tube Mounting Bracket
4 . Waste Disposal Hose
5 . Hose Clamp
6 . Sewer Hose Fitting
7 . Storage Tube Cap
8. Rivet
9. Cap Cable
10 . Nut
11 . Washer
12 . Brace
13 . Mounting Plate
13
A-4794
INSTALLATION (FIGURE 5)
1 . Position sending unit and new gasket at hold-
ing tank with lead wire in the three o'clock position .
2. Install five retaining screws and hook up elec-
trical leads.
DUMP TUBE
For dump tube removal, see "Fullway Valve Re-
moval" earlier.
SEWER HOSE ASSEMBLY
(FIGURE 6)
REMOVAL
1 . Open the storage tube cap (7) and remove the
sewer hose assembly (4, 5, and 6) .
Figure 6-Sewer Hose Storage Tube - Exploded View
2. Loosen hose clamp (5) and separate waste dis-
posal tube (4) from sewer hose fitting (6).
3 . Remove two upper outside nuts (10) and wash-
ers (11), that secure tube mounting brackets (3) to
spare tire carrier (2). Remove hose storage tube (1)
with tube mounting brackets (3).
INSTALLATION
1 . Secure hose storage tube (1) by two tube
mounting brackets (3) to spare tire carrier (2) with
two upper outside nuts (10) and washers (11) .
2. Secure sewer hose fitting (6) to waste disposal
tube (4) with hose clamps (5).
3 . Store sewer hose assembly in storage tube . Re-
place storage tube cap (7).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents