GMC 1976 ZEO 6083 Maintenance Manual page 824

Table of Contents

Advertisement

Figure 2-Toilet Water Fill Connection
TOILET REPLACEMENT
REMOVAL
1 . Turn off water pump and release pressure at
any faucet .
2. Disconnect toilet water fill line shown in Fig-
ure 2, and disconnect the toilet wires.
3 . Remove base moldings from lower sides of
toilet.
4. Remove the two nuts under the toilet securing
it to the floor.
5 . Lift off toilet .
INSTALLATION
1 . Install new flange seal on slide valves .
2. Place toilet on flange making sure bolts line up
through mounting brackets .
3. Secure toilet in place with two nuts under toilet
at mounting brackets .
4. Connect toilet water fill line and wires (figure
DISASSEMBLY AND REPAIR
(FIGURE 3)
FUSE REPLACEMENT
1 . Remove two cover mounting screws and mo-
tor cover.
2. The fuse is now accessible for checking or
changing, see Figure 3.
TIMER REPLACEMENT
TOILET
24K- 5
1 . Disconnect lead wires from power source (fig-
ure 3) .
2. Remove two cover mounting screws and mo-
tor cover (figure 1) .
3. Disconnect leads from pump assembly motor
(figure 3) .
4. Remove two timer bracket mounting screws
and timer assembly .
5 . Install by reversing steps 1-4.
PUMP REPLACEMENT
1 . Disconnect lead wires from power source.
2. Remove two cover mounting screws and mo-
tor cover .
3. Disconnect leads from pump assembly motor.
4. Completely evacuate unit .
5 . Remove cover and bowl assembly screws (two
in rear from top side and two in front from bottom
side) and remove cover and bowl assembly (figure 3) .
6. Remove four pump mounting screws (figure
7. Disconnect flush tube from pump outlet (fig-
ure 3) .
8 . Remove pump assembly (figure 3) .
9. Install by reversing steps 1-8 .
SLIDE VALVE REPLACEMENT (FIGURE 3)
1 . Remove toilet from module . See "Toilet Re-
placement" earlier in this section.
2. Turn toilet upside down and remove the four
screws and remove valve.
3 . Install by reversing steps 1 and 2 .

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents