Drive Sled Taping Diagrams - IBM TS3100 Setup, Operator, And Service Manual

Ibm system storage tape library
Table of Contents

Advertisement

2U Library
Figure 10-20. Drive sled taping diagrams
2. Power ON the replacement library enclosure.
10-20
TS3100 Tape Library and TS3200 Tape Library Setup, Operator, and Service Guide
Note: The gray markers show where conductive tape should be placed.
i. Push the black tab back underneath the drive sled. When inserted properly,
only the handle of the tab will be visible.
a. If power ON is successful:
1) After power up, the Ready/Activity LED ( 1 in Figure 10-23 on page
10-24) will turn ON.
a) If the following message is displayed after the library powers ON,
follow the instructions in Step 1. If the message is NOT displayed
skip Step 1 and proceed to Step 2.
[New library detected.]
[1. Perform Library Verify]
[2. Power Off and insert LCC]
[from old library ]
[
ok
b) The system will initialize completely.
c) After confirming the pop-up, you should be able to use the
interfaces.
d) Run the Library Verify test (Operator Control Panel: Service >
Library Verify). This diagnostic requires a blank or scratch data
cartridge
2) Power OFF the replacement library enclosure.
3) You must power down, remove the CRU LCC and replace it with the
original LCC to have VPD transferred from the original LCC to the new
chassis.
4) Proceed to "Swapping Power Supplies" on page 10-21.
b. If power ON is not successful:
4U Library
]

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ts3200

Table of Contents