Suzuki 2005 GSF1200 Service Manual page 230

Table of Contents

Advertisement

1J-9 Charging System:
• Apply a small quantity of THREAD LOCK "1342" to
the bearing retainer screws and tighten them to the
specified torque.
: Thread lock cement 99000–32050 (Thread
Lock Cement 1342 or equivalent)
Tightening torque
Bearing retainer screw (a): 2.5 N·m (0.25 kgf-m,
1.8 lb-ft)
(a)
• Install the bearing and rotor using a hand-press "A".
"B"
"A": Hand-press
1
"A": Hand-press
"B": jig
(a)
I649G11A0023-02
"A"
I649G11A0024-02
"B": Jig
"A"
2
"B"
I649G11A0025-02
1. Bearing
2. Rotor
NOTE
Before reinstalling the slip ring side bearing
onto the generator end housing, turn the
expander ring and align the expander ring lug
"C" with the center of the chamfered edge
"D" of the bearing outer race.
6
2. Rotor
3. Bearing cover #2
4. Slip ring side bearing
• Tighten the generator housing nuts (7) to the specified
torque.
Tightening torque
Generator housing nut (b): 4.5 N·m (0.45 kgf-m,
3.25 lb-ft)
"C"
"D"
I649G11A0026-02
5
4
3
2
"B"
I649G11A0027-02
5. Bearing cover #1
6. Expander ring
"B": Jig

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2005 gsf1200s1200 banditGsf1200Gsf1200s

Table of Contents