210 Chapter 14 Power-and-ground hardware of a Passport 15000 or 20000

Powerup of a Passport 15000 or 20000

Prerequisites to powerup of a Passport 15000 or 20000
241-1501-240 5.2S2
Power up a Passport 15000 or 20000 to enable the switch hardware to be
downloaded with software for initial operation or to return the system to
operation.
"Prerequisites to powerup of a Passport 15000 or 20000" (page 210)
"Powerup of a Passport 15000 or 20000 task flow" (page 211)
You need access to 241-5701-270 Passport 7400, 15000, 20000 Software
Installation Guide.
All cables must be installed for interworking equipment, signalling
(traffic), timing, and alarms.
All power cables must be installed from the breaker interface panel (BIP)
up to the power source without being connected and must have passed the
checks with the power off.
All equipment that is connected to or interworking with the
Passport 15000 or 20000 must share the same site ground window.
Each Passport sparing panel will be powered up from the function
processor (FP) cards through the control port cable when at least one FP
is powered up.
The following interworking equipment can be powered up independently
from the BIP, but needs to be on to verify operation of the system:
— an EdgeLink 100 DS3 multiplexor
— the hardware of a Preside Multiservice Data Manager (MDM)
— a local operator terminal and its modem (if present)
— a multiport aggregate device
— the Passport 7400 of a Passport 15000-VSS
— a Shasta 5000 that shares a NEBS 2000 frame with a Passport 15000
or 20000