168 Chapter 11 Initial switch hardware installations
Parts installation in a Passport 20000 in a NEBS 2000 frame
Prerequisites to parts installation Passport 20000 into a NEBS
2000 frame
Parts installation of a Passport 20000 in a NEBS 2000 frame
task flow
241-1501-240 5.2S2
Install the parts of a Passport 20000 that is mounted in a NEBS 2000 frame
to enable the switch to be put into service.
•
"Prerequisites to parts installation Passport 20000 into a NEBS 2000
frame" (page 168)
•
"Parts installation of a Passport 20000 in a NEBS 2000 frame task flow"
(page 168)
•
The NEBS 2000 frame must already be installed as indicated by "NEBS
2000 frame installation" (page 161).
•
Power and ground cables must be routed to the planned location of the
Passport prior to beginning this task. See the 241-1501-205 Passport
15000, 20000 Site Requirements and Preparation Guide.
This task flow shows the sequence of procedures you do to install a
Passport 20000. To link to any procedure, go to "Task flow navigation"
(page 170).