Multiport Aggregate Device Installation; Prerequisites To Multiport Aggregate Device Installation - Nortel Passport 15000 Hardware Installation And Maintenance

Hide thumbs Also See for Passport 15000:
Table of Contents

Advertisement

186 Chapter 13 Peripheral equipment

Multiport aggregate device installation

Prerequisites to multiport aggregate device installation

Multiport aggregate device installation task flow
241-1501-240 5.2S2
Install a multiport aggregate device to break out the ports of a 32-port E1
TDM FP.
"Prerequisites to multiport aggregate device installation" (page 186)
"Multiport aggregate device installation task flow" (page 186)
You must be familiar with "Safety considerations and best practices"
(page 53).
You will need a multiport aggregate devices with one of the following
PECs:
— NT0486 for the balanced
— NT0421 for the unbalanced
The multiport aggregate device installs in a 19-inch rack or requires one
pair of the adapter brackets from kit NTHW14 to be installed in a NEBS
2000 frame.
This task flow shows the sequence of procedures you do to install a multiport
aggregate device. To link to any procedure, go to "Task flow navigation"
(page 189).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 20000

Table of Contents