FP decommissioning

Prerequisites for FP decommissioning

FP decommissioning task flow
Figure 33
Task flow of an FP decommissioning
PP_TASK_1050.ins
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade
Decommission an FP by nullifying the existing slot configuration and
replacing the card with a blank processor card.
"Prerequisites for FP decommissioning" (page 143)
"FP decommissioning task flow" (page 143)
Ensure you have access to 241-5701-600 Passport 7400, 15000, 20000
Configuration Guide so that you can follow the software procedures used
by this task.
You must have a replacement card to fill the empty slot so that system
cooling and EMI protection are maintained. A blank processor card has
PEC NTHR64. This card is also referred to as a filler module.
This task flow shows the sequence of procedures to decommission an FP. To
link to any procedure, go to "Task flow navigation" (page 144).
FP
decommissioning
Chapter 10 Function processors 143
Locking a function
processor
Removing an FP
Decommissioning a
processor card
Installing a blank
processor card
For procedure page
numbers, see
Task flow navigation
below
End
5.2S2