Chapter 11
Initial switch hardware installations
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade
Select from the following alphabetical tasks to complete initial installation of
an empty NEBS 2000 frame, Passport 15000, Passport 20000, or
Passport 15000-VSS:
•
"Installation of a second switch into a NEBS 2000 frame" (page 156)
•
"NEBS 2000 frame accessories" (page 115)
•
"NEBS 2000 frame installation" (page 161)
•
"Parts installation in a Passport 15000 in a NEBS 2000 frame"
(page 165)
•
"Parts installation in a Passport 20000 in a NEBS 2000 frame"
(page 168)
•
"Passport 15000-VSS installation" (page 171)
•
"Passport 15000 or 20000 switch installation into an EIA rack"
(page 173)
For other initial installations of equipment that is used with Passport in a
NEBS 2000 frame or equivalent mounting apparatus, see "Peripheral
equipment" (page 183).
155
5.2S2