Juniper EX9214 Hardware Manual page 88

Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

EX9214 Switch Hardware Guide
64
Table 30: Site Preparation Checklist (continued)
Item or Task
Calculate the power consumption
and requirements.
Rack or Cabinet
Select the type of rack or cabinet
and verify that it meets the
minimum requirements for the
installation of the switch.
Plan rack or cabinet location,
ensuring the required space
clearances.
Secure the rack or cabinet to the
floor and building structure.
Cables
For More Information
"AC Power Supply
Specifications for EX9214
Switches" on page 78
"DC Power Supply
Specifications for EX9214
Switches" on page 81
"Power Requirements for
EX9200 Switch
Components" on page 77
"Calculating the EX Series
Switch Fiber-Optic Cable
Power Budget" on page 84
"Calculating the EX Series
Switch Fiber-Optic Cable
Power Margin" on page 84
"Rack Requirements for an
EX9200 Switch" on page 71
"Cabinet Requirements for
an EX9200 Switch" on
page 73
"Clearance Requirements
for Airflow and Hardware
Maintenance for an EX9214
Switch" on page 74
"Rack Requirements for an
EX9200 Switch" on page 71
"Cabinet Requirements for
an EX9200 Switch" on
page 73
Copyright © 2015, Juniper Networks, Inc.
Performed
by
Date

Advertisement

Table of Contents
loading

Table of Contents