Installation; Overview - Wi-LAN Hopper Plus 120-24 Installation And Configuration Manual

Table of Contents

Advertisement

Installation

Overview

This section explains how to install Hopper Plus units. You will first assemble, configure and test units in a
controlled environment so that any problems can be solved easily, and then install units in the field. By going
through this process, you will ensure a successful installation, save time spent on-site, and reduce travel from
site to site.
The following basic process should be followed.
1. Obtain the network plan, equipment and tools.
2. Assemble units
—Check the contents of each Hopper shipping package to ensure that you have received the required
parts.
—Connect the indoor antenna, connect the power supply unit, and check the power.
3. Pre-configure units—Configure units according to the network plan.
4. Bench test units—Test basic RF and network operation of units in a controlled environment.
5. Install units—Place the tested units in their field locations and connect them to antennas, the wired
network, and DC power.
6. Test Network—Test the operation of the installed network.
DEC 2000 Rev 02
Obtain
1
Network Plan
Assemble
2
Units
Pre-Configure
3
Units
Bench Test
4
Units
Install
5
Units
Test
6
Network
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents