Wi-LAN Hopper Plus 120-24 Installation And Configuration Manual page 65

Table of Contents

Advertisement

12. View the link statistics. From the Main Menu select Link Monitor Display and press
Link Monitor Statistics window is displayed.
Link Monitor Rank
Base to Remote BER
Remote to Base BER
Missed Packet Count
Base to Remote Env Power
Base to Remote Corr Power
Remote to Base Env Power
Remote to Base Corr Power
13. Check for BER = 0.0E+00 and Corr Power between 15 – 50
receive signal is probably too weak. If the power is >55 dB the receiving unit is probably saturated. See
Viewing Link Monitor
If you have problems, ensure that the unit is configured to its basic default settings (see
Configurations, page 94) and reconfigure the unit, or contact Wi-LAN Technical Assistance Center.
14. When finished viewing link monitor statistics, disable Link Monitor to remove the test overhead data
from the RF link. Select RF Station Configuration from the Main Menu and press
Station Configuration menu is displayed.
15. Select Link Monitor Period and press
16. Type 0 in the field and press
17. Press
to exit.
Esc
To perform Link Monitor test from a remote unit
1. Connect the test PC to the MANAGEMENT port of the remote unit. See
Performing RF
Tests, page 50.
2. Log in to the unit and go to the Main Menu.
DEC 2000 Rev 02
RF Link Monitor Statistics
Statistics, page 96 for more information about Link Monitor Statistics.
. The link monitor test ends.
Enter
1
0.0E+00
0.0E+00
0
27
28
29
30
dB.
If the Corr Power is <15 dB the
. The field is highlighted.
Enter
RF Station Configuration
. The RF
Enter
Restoring Factory
. The RF
Enter
General Equipment Setup for
53

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Wi-LAN Hopper Plus 120-24

Table of Contents