Overview
This section explains how to install AWE units. You will first assemble, configure and test units in a controlled
environment so that any problems can be solved easily, and then install units in the field. By going through this
process, you will ensure a successful installation, save time spent on-site, and reduce travel from site to site.
The following basic process should be followed.
1
2
3
1. Obtain your network plan (see
2. Assemble units.
—Check the contents of each AWE shipping package to ensure that you have received the required parts.
—Connect an indoor antenna or dummy load, connect the power supply unit and check the power.
3. Configure units—Set unit parameters according to the network plan.
4. Bench test units—Test basic RF and network operation of units in a controlled environment.
5. Install units—Place the tested units in their field locations and connect them to antennas, the wired
network, and power.
6. Test Network—Test the operation of the installed network.
JUN 2002 Rev 02
Obtain
4
Network Plan
Assemble
5
Units
Configure
6
Units
Appendix G: Network Plan Template on page
Bench Test
Units
Install
Units
Test
Network