Testing Transfer Of Control - HP 3000 99x Family Installation Manual

9000 systems t- class
Table of Contents

Advertisement

Testing Transfer of Control

It is a wise idea to test Transfer of Control (TOC) during the installation. Execute a TOC
using the procedure below, monitor the messages that appear on the console, and see
whether the system successfully reboots.
To execute a TOC:
1. If the console is locked, unlock it with the front panel keyswitch.
2. Enter
-B at the system console to enter the Access Port control mode.
<Control>
3. At the AP prompt (CM> ) (Control Mode), enter SP to access the Service Processor (SP)
commands.
4. At the SP prompt enter TC to execute a Transfer of Control (TOC).
5. At the SP prompt enter CO to return to console mode and monitor boot process
messages.
6. After the boot process is complete, lock the console using the front panel keyswitch.
Chapter 3
Installation
Testing Transfer of Control
3-75

Advertisement

Table of Contents
loading

Table of Contents