Power Budget Worksheet For The 99X Hp-Pb Card Cage; Table B-3. Hp-Pb Power Budgeting Worksheet (99X - HP 3000 99x Family Installation Manual

9000 systems t- class
Table of Contents

Advertisement

Configuring the HP-PB Card Cage
Planning the HP-PB Configuration

Power Budget Worksheet for the 99x HP-PB Card Cage

Table B-3
HP-PB Power Budgeting Worksheet (99x)
I/O Card
Qty
1
LAN/Console
(ThinLAN)
LAN/Console
(Ethertwist or
ThickLAN)
1
HP-FL (PB-FL)
1
SCSI
Fast/Wide SCSI
2
1
PBA-IB
(HP-IB)
802.3 LAN
802.5 Token Ring
PSI
Sum of power used per voltage:
(Must not exceed total below)
Maximum power available per voltage in HP-PB I/O
card cage
Total power used for +12V, +5V, −12V
(Must be less or equal to 222.82 watts)
1. I/O cards included in base configuration.
B-6
Power Requirements
per I/O Card (watts)
−12V
+12V
+5V
0.40
14.20
0.40
6.60
14.20
0.40
0.48
19.65
0.60
0.00
4.50
0.00
0.12
20.5
0.00
1.13
27.50
0.66
6.00
10.65
0.00
0.00
8.30
0.00
.98
12.00
1.07
Total Power Required
(watts)
−12V
+12V
+5V
71.64
161.58
23.64
Total
Slots/
Slots
Card
Used
2
2
2
1
2
2
1
1
1
Total slots used
_______
(Must not
exceed 14)
Appendix B

Advertisement

Table of Contents
loading

Table of Contents