Introduction
Terminology
Unpacking and Inspection
Processor Configuration
Power Supply Configuration
I/O Configuration
Initial Power Up and Selftest
Audience
Customers should read the information in Chapter 1 (Introduction) and Chapter 2
(Unpacking and Inspection).
HP Customer Engineers (CEs) and service personnel who have successfully completed
HP's authorized training should perform the procedures in Chapter 3 (Installation).
Site Preparation
Before the system can actually be installed, the system site must comply with the
specifications outlined in the 99x/T-Class Systems Site Preparation and Requirements
Guide (PN A1809-90002)
The service and installation requirements for any peripheral equipment to be installed
with the system should also be taken into consideration before the installation process gets
under way. Refer to the appropriate manual for each peripheral being installed.
Tools
The following tools are required for computer installation:
Standard hand tools
Digital Voltmeter (capable of reading AC/DC voltages)
#10 Torx-drive screwdriver
#15 Torx-drive screwdriver
Other References
Related manuals include:
CE Handbook (PN A1809-90003)
99x/T-Class Systems Operator's Guide (PN A1809-90009)
99x/T-Class Systems Site Preparation and Requirements Guide (PN A1809-90002)
99x/T-Class Systems Expansion Cabinet Installation Guide (PN A1809-90006)
99x/T-Class Systems HP-PB Cardcage Installation Guide (PN A1809-90013)
99x/T-Class Systems Bus Converter Card Installation Guide (PN A1809-90012)
99x/T-Class Systems Add-On Memory Installation Guide (PN A1809-90005)