Startup Process; Figure 3-23 Switches And Indicators - HP 3000 99x Family Installation Manual

9000 systems t- class
Table of Contents

Advertisement

9. When all external equipment have their READY or ONLINE indicators lit, turn on AC
to the SPU cabinet by switching on the power switch (circuit breaker) at the bottom
rear of SPU cabinet.
10.Turn the "Standby-Ready" switch at the top front of SPU cabinet to the "Ready"
position.
Figure 3-23
Switches and Indicators

Startup Process

After you turn on the AC circuit breaker on the rear of the cabinet, the Service Processor
begins its startup process:
1. For about 1 second, all control panel LEDs (except the REMOTE ENABLED indicator)
are turned on in various patterns. The power supply fans in the rear of the cabinet
should turn on. A few moments later the REMOTE ENABLED LED turns ON if remote
console is enabled.
Chapter 3
Installation
Verifying the System
3-49