Installation And Service Clearances - REMEHA GAS 210-80 ECO PRO Technical Information

High efficiency low nox gas boiler
Hide thumbs Also See for GAS 210-80 ECO PRO:
Table of Contents

Advertisement

4. Installation

4.3 Installation and service clearances

1
50
1190
3
600
fig. 02
Boiler room installation options
12
Clearance of at least 60 cm is required at the front of the boiler .
However, we recommend a clearance of 1 m. W e recommend a
clearance of at least 40 cm above the boiler control panel, at least
5 cm on the left side and at least 25 cm on the right side in con-
nection with condensed water discharge. Install a gas cock in the
immediate vicinity of/above the boiler.
1490
250
2100
450
450
600
2
50
1190
2930
250
1190
4
1890
450
1190
114492LTAL21H002a
GAS 210 ECO PRO
250
250
114494-190310

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents