Commissioning; Control Panel; Normal Start-Up Procedure - REMEHA GAS 210-80 ECO PRO Technical Information

High efficiency low nox gas boiler
Hide thumbs Also See for GAS 210-80 ECO PRO:
Table of Contents

Advertisement

GAS 210 ECO PRO

9 Commissioning

9.1 Control panel

fig. 17
Control panel
1 = Display
2 = [Menu] key
3 = [Service engineers] key
4 = [Escape] or [reset] key
114494-190310
The boiler's control panel contains four function keys, a menu key ,
a service engineers key, an on/off switch and a display.
2
3
4
5
5 = [Central heating temperature] or [-] key
6 = [+] key
7 = [enter] key or [Service] indicator
8 = On/off switch
The display has four positions and several symbols and provides
information about the operating status of the boiler and any faults.
Numbers, dots and/or letters may be shown. The symbols in the
display above the function keys indicate what the function of the
relevant keys is at that moment. If no key is pressed for three min-
utes, the display lighting switches of f and only the  and  sym-
bols are displayed. Press any key; the current boiler status and
the current operating code appear on the display . This is always
displayed in the event of a fault.

9.1.1 Normal start-up procedure

Switch on the mains supply to the boiler; the Gas 210 ECO PRO
will perform the start-up program.
The following will appear in succession in the display:
- a short display test, whereby all of the display's segments are
visible;
fXx software version alternating with 1;
pXx parameter version;
- Afterwards (depending on the operating status), the following
may appear on the display:
N : L (flashes) : live and nutral wires are wrongly connected; chan-
ge wires on the 230V terminal strip!
1
Bar
6
7
9. Commissioning
8
114492LTAL21H008a
31