Commissioning

Commissioning
The installer must complete the installation and commissioning checklist below and make sure
this manual is left with you. They must also explain about the use and care of the Symmetry
and make sure you understand the safety instructions and operation of the appliance.
If operating without a dress guard please follow the safety instructions to prevent the risk of
injury.
Checklist
Appliance positioned in a suitable location (clearances, combustible clearances, mantels
and surrounds etc.).
Rinnai flue system installed and tested to ensure effective draw.
Gas pressure checked and set.
Burn media installed as per instructions.
Appliance tested for correct operation and to ensure no gas leaks.
Customer instructed on operating procedure and safety requirements.