  • Page 1 Models: RDV2320MN/L, RDV2320CN/L Novo direct vent inbuilt gas fireplaces Installation guide...
  • Page 2 Important Appliance must be installed with a Rinnai approved flue system. This appliance shall be installed in accordance with: Manufacturer’s installation instructions Current: AS/NZS 5601 Gas Installations AS/NZS 5263 Gas Appliances General Requirements AS/NZS 3000 Electrical Standards AS/NZS 3500 Plumbing and Drainage Standards For use with Natural Gas or Universal LPG as indicated on the appliance.
  • Page 3: Table Of Contents

    Contents Before you start ............4 Optional accessories ..........5 Specification ............6 Unit dimensions ............7 Positioning ............8 Flooring and hearth material selection ....9 TV installation ............10 Enclosure dimensions ..........11 Gas supply and connection ........12 Electrical supply............13 Masonry installation overview.......14 Mock chimney installation overview .....16 Aeration plates............18 Installation: Fire to flange connection ....19 Burn media installation .........20...
  • Page 4: Before You Start

    Before you start Unpack the appliance and components and check for damage. DO NOT install any damaged items. Check all components have been supplied, refer below, and that you have the correct gas type. Read these instructions to get an overview of the steps required before starting the installation. Failure to follow these instructions could cause a malfunction of the appliance.
  • Page 5: Optional Accessories

    The Rinnai R7000 Wi-Fi board retrofit kit installations where the cavity is slightly larger enables the fire to be connected to the Rinnai than the frame. The panel will cover the gap Fire Wi-Fi App for full thermostatic control, as behind the fire and the standard rectangular well as other features such as timers.
  • Page 6: Specification

    Operated using a simple IR remote to control flame height and fan speed, or by the Rinnai Wi-Fi app (optional accessory) that allows full thermostatic control, as well as other features such as timers.
  • Page 7: Unit Dimensions

    Unit dimensions (mm) Coaxial in timber Colinear in masonry Viewable glass Viewable glass 530 x 294 530 x 294 26.5 1050 Masonry infill panel Novo DV inbuilt installation guide: 13748-C 03-22 | 7...
  • Page 8: Positioning

    Positioning Combustible clearances The Novo must not be installed where curtains, furniture, or other combustible materials could come into contact with the fire while it is operating. The 400 mm side clearance, measured from the edge of the glass, includes 400 mm side walls.
  • Page 9: Flooring And Hearth Material Selection

    Flooring and hearth material selection Flooring and hearth material selection The temperature in front of the fire (200-350 mm x 400 mm wide) can reach up to 40 °C above ambient, which is why material selection is important, some guidelines are detailed below. For example we know that vinyl planks are only rated for ambient temperatures which is why the fire would not be suitable for installation directly on the floor.
  • Page 10: Tv Installation

    TV manufacturer— minimum some have warranty conditions that state a TV is not to be installed above a fireplace. Rinnai does not accept any responsibility for damage to a TV resulting from the use of this information. 400 mm...
  • Page 11: Enclosure Dimensions

    Enclosure dimensions The Novo must be positioned within the enclosure on a level surface that allows free movement of the appliance. The enclosure must be capable of supporting 1.5 times the weight of the unit. MASONRY Enclosure dimensions With infill panel Actual size needs to be at least 200 x 200 mm for the flexi flues to fit down the chimney W-width...
  • Page 12: Gas Supply And Connection

    Gas supply and connection Gas pipe sizing must consider the gas input to this appliance as well as all other gas appliances in the premises. The gas meter and regulator must be specified for the total gas rate. An approved sizing chart such as the one in AS/NZS 5601.1 should be used.
  • Page 13: Electrical Supply

    This must be a genuine replacement part available from Rinnai. Using an existing externally mounted power point If you already have an existing power point outside the enclosure, you can redirect the power cord through the LHS or RHS of the front panel.
  • Page 14: Masonry Installation Overview

    Masonry installation overview 1. Modify the enclosure: Ensure the enclosure meets the requirements set out on p.11. 2. Gas and electrical connections: Prepare gas and electrical connections, refer p.12-13. 3. Take the masonry adapter frame and colinear flue adapter off the engine The adapter frame and flue adapter come assembled on the engine and need to be taken off.
  • Page 15 Actual chimney size needs to be at least 200 x 200 mm for the two flexi flues to fit Masonry adapter frame Exhaust flue Colinear Air intake flue adapter Aeration plate Green air inlet seal Red exhaust seal Novo DV inbuilt installation guide: 13748-C 03-22 | 15...
  • Page 16: Mock Chimney Installation Overview

    Mock chimney installation overview 1. Modify the enclosure: Ensure the enclosure meets the requirements set out on p.11. 2. Gas and electrical connections: Prepare gas and electrical connections, refer p.12-13. 3. Take the zero clearance box (zcb) and coaxial flue adapter off the engine The zcb and flue adapter come assembled on the engine and need to be taken off.
  • Page 17 Mock chimney enclosure Novo DV with zcb and adapter removed Zero clearance box installed Zero clearance box and coaxial flue adapter Zero clearance box Coaxial flue adapter Aeration plate Red exhaust seal Novo DV inbuilt installation guide: 13748-C 03-22 | 17...
  • Page 18: Aeration Plates

    Aeration plates The Novo has an aeration plate factory fitted either side of the unit, refer photo. The plates are fitted in a position for flue lengths between 3-5.5 m. Two additional plates are supplied in the accessory pack, these are for flues between 5.6-8 m.
  • Page 19: Installation: Fire To Flange Connection

    Installation: Fire to flange connection The below installation step is common to masonry and mock installations. IT IS CRITICAL to the safe operation of the fire. Once the fire has been screwed to the zero clearance box or masonry adapter frame, the front face of the frame and the front flange of the fire should be pulled up hard against each other.
  • Page 20: Burn Media Installation

    Burn media installation The granule pack and log set, consisting of five logs, comes packaged inside the appliance. Use extreme care when handling the logs, they are fragile and will damage easily. The unit must never be used with broken logs or other burn media. Experience has shown that the majority of performance problems are caused by burn media being installed incorrectly.
  • Page 21 Ensure the left hand log is pushed hard against the left and rear ceramic panels. DO NOT place the granules directly in front of the pilot flame If there are some abnormally long streaky flames, then readjust the granule position around the burner holes until the flames have improved.
  • Page 22: Commissioning

    Commissioning The gas pressures must be checked against those printed on the data plate of the appliance. The pressures are factory set and may not require adjustment. When checking the operating pressures the combustion chamber glass must be on. The commissioning sheet is located in a plastic pouch inside the unit on top of the PCB cover. Follow the commissioning instructions to complete the gas pressure checks.
  • Page 23: Wi-Fi Module Installation (If Applicable)

    Wi-Fi module installation (if applicable) If the Wi-Fi module retrofit kit has been purchased as an accessory, complete the installation using the instructions provided in the kit. Once installation has been completed check, when the power is on, that the Wi-Fi LED flashes and turns a solid red. This indicates everything is ready for setup via a smart device.
  • Page 24: Test Operation And Lighting Sequence

    If the appliance cannot be made to perform correctly please contact Rinnai. Soot build up Installation checklist and customer handover Complete the installation checklist in the customer operation guide, and make sure you leave the guide with the customer.
  • Page 25: Wiring Diagram

    Wiring diagram (part of commissioning) gr/y gr/y gr/y 1 2 3 4 5 6 7 8 Light Only for RDV600-700 r bl 1 2 3 1 2 3 4 5 6 7 8 9 13 12 11 10 9 8 7 6 5 4 3 2 1 gr/y 12 11 10 9 8 7 6 5 4 3 2 1 4 3 2 1...
  • Page 26: Novo Flueing

    Supporting the flue is usually completed during the framing stage with flue supports or straps within the cavity. Wall straps have been included in the Rinnai coaxial vertical flue kit. Ember adaptor (transition) Elbow straps are also available as a separate 25 mm clearance to a combustible surface―the...
  • Page 27 Flue cowl clearance To ensure products of combustion are cleared, adequate clearance from the building is required. 500 mm to The flue cowl should have a 500 mm clearance nearest part of roof from any part of the building. This also applies to steeped and pitched roofs where the flue cowl should be 500 mm clear of the ridge line.
  • Page 28: Flueing Option: Masonry Vertical

    Flueing option: Masonry vertical Colinear flexi flues with Duravent cowl Masonry vertical flexi flue kit 5.5 m DV For installations in a masonry fireplace. Extends out to 5.5 m. If longer flueing is required then the colinear flexi flue extension kit needs to be ordered.
  • Page 29: Flueing Option: Mock Chimney Vertical

    Flueing option: Mock chimney vertical Coaxial flue with Duravent cowl Max. 2m Straight vertical flueing If doing a short vertical flue (no bends) for a single storey dwelling, the mock chimney vertical flue kit 3.6 m (R3665) can be used otherwise the flue components can be ordered separately. Flue pipe(s) or flue extension.
  • Page 30: Novo Dv Flue Components

    Novo DV flue components Coaxial vertical flue kit 3.6 m Flue pipe extensions Coaxial 45° flue elbows Kit includes: 75-175 mm: R3638 Two bends in a kit. • Coaxial vertical roof cowl 75-360 mm: R3639 (R3651) Offsets obstructions. Elbow Used for extended straight swivels 360°...
  • Page 31 Wall strap DV High wind vertical cowl Adjustable strap used in protection kit installations to add lateral For windy areas such as support to the flue. Wellington, coastal properties, or elevated properties on hills. Provides a 50-200 mm Designed to wrap around the clearance to combustibles.