Commissioning - WAGNER GM 1-350 Operating Manual

Airless manual gun
Table of Contents

Advertisement

VERSION 02/2015
OPERATING MANUAL
6.6

COMMISSIONING

6.6.1
SAFETY INSTRUCTIONS
Observe safety instructions in Chapter 4.
6.6.2
PREPARATION FOR COMMISSIONING
Impurities in the spraying system!
Clogging of the spray gun
Flush the spray gun and paint supply with a suitable fl ushing agent before
commissioning.
6.6.3
COMMISSIONING
1. Secure the spray gun.
2. Connect the product hose to the spray gun and product supply system.
3. For spray guns with fi lters
4. Insert the saddle and seal into the nozzle holder. Push in the Profi Tip nozzle. Screw
the entire nozzle holder onto the spray gun. Tighten nozzle holder using an open-
end wrench (size 30).
5. Visually check the permissible pressures for all the system components.
6. Make sure that the device and all other conductive parts within the work area are
grounded.
7. To perform a leak test on the entire installation, the pressure is slowly increased
using a suitable medium, step by step, until the maximum pressure indicated on the
type plate is reached.
Note:
Set the operating pressure to 100 bar; 10 MPa; 1450 psi.
Pull the trigger and check whether the gun closes cleanly upon release.
8. Relieve the pressure of the spray gun and product pressure generator and secure
the spray gun.
6.6.4
VERIFYING A SAFE OPERATIONAL CONDITION
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
This includes:
- Carry out a safety check in accordance with Chapter 8.2.3.
ORDER NUMBER DOC2349369
NOTICE
insert a suitable fi lter (fi lter insert, see Chapter 13.2).
GM 1-350/530
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gm 1-530

Table of Contents