VERSION 02/2015
OPERATING MANUAL
6.2.2
VENTILATION OF THE SPRAY BOOTH
Observe the safety instructions in Chapter 4.1.3.
Operate the device in a spray booth approved for the working materials.
-or-
Operate the device on an appropriate spraying wall with the ventilation (extraction)
switched on.
Observe national and local regulations for the outgoing air speed.
6.2.3
PRODUCT SUPPLY
Impurities in the spraying system!
Spray gun blockage, materials harden in the spraying system
Flush the spray gun and paint supply with a suitable fl ushing agent.
6.3
GROUNDING
Observe the safety instructions in Chapter 4.2.2.
Discharge of electrostatically charged components in
atmospheres containing solvents!
Explosion hazard from electrostatic sparks or fl ames.
A conductive connection (potential equalization cable) must be established between
original bundles and the equipment.
6.3.1
GROUNDING CHECK
Daily: Before starting work, carry out a visual inspection to ensure that the system is
grounded.
6.4
SAFETY CHECKS
Daily: Check the grounding (see Chapter 6.3) and hoses (see Chapter 8.2.3.1).
6.5
PREPARATION OF LACQUER
The viscosity of the lacquer is of great importance. The best spraying results are obtained
with values between 80 and 260 millipascals x sec (mPa∙s).
Please also read the technical data sheet of the lacquer for optimal processing, viscosity
adjustment and intermixing of the product.
ORDER NUMBER DOC2349369
NOTICE
WARNING
Ground all device components.
Ground the work pieces to be coated.
GM 1-350/530
14