Extreme Networks Altitude 4760 Series Installation Manual page 31

Table of Contents

Advertisement

Altitude 4760 Series Access Point Hardware Mounting and Installation
8 With the Access Point positioned so that the gore vent is facing down, insert the two M6
hex flange screws in the bottom holes on the sides of the Access Point bracket section
into the open slot connections on the bottom of the angle adapter bracket section.
9 Rotate the Access Point bracket section upward and align the top holes on the sides with
the top holes on the angle adapter bracket section. Insert two M6 hex flange screws into
the top holes on the angle adapter bracket section.
10 Use a torque wrench, or a ratchet and a 10mm socket, oran adjustable wrench, to finish
attaching the Access Point bracket section to the angle adapter bracket section with the
M6 hex flange screws in the open slot connections and the top holes on the angle
adapter bracket section. Do not tighten the screws until all rotation and tilt adjustments
are complete.
11 To adjust the position of the Access Point, rotate the Access Point bracket section (plus or
minus 15 degrees) and tilt the angle adapter bracket section (up to 45 degrees).
12 Tighten all hex flange screws to 60 inch pounds (lbf-in).
Altitude™ 4760 Series Access Point Installation Guide
31

Advertisement

Table of Contents
loading

Table of Contents