Preparations For Trial Run Of Engine; Conduct Test Run; Verification Of The Throttle Lever Detent For Max - Rotax 912 Series Installation Manual

Hide thumbs Also See for 912 Series:
Table of Contents

Advertisement

3) Preparations for trial run of engine

General note
3.1)

Conduct test run

See Operators Manual 912 chapter. 3.
Instruction
3.2)
Verification of the throttle lever detent for max. continuous power:
Performance check in accordance with Operators Manual.
Instruction
If nominal performance won't be reached or is in excess of, examination of
the installation and engine will be necessary.
Effectivity: 912 Series
Edition 2/Rev. 0
BRP-Powertrain
INSTALLATION MANUAL
Non-compliance can result in serious injuries or death!
WARNING
WARNUNG
Prior to engine start and operation review all instruc-
tions stated in the Operators Manual.
Don't conduct any test flights before fault has been
NOTICE
WARNUNG
traced and found.
10-10-00
page 14
August 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents