Ground The Third-Party Pots Splitter; Figure 3-4 System Ground Connection - Cisco 6260 Installation Manual

Hide thumbs Also See for 6260:
Table of Contents

Advertisement

Installation Procedures
Figure 3-4
STATUS
ACTIVE
ATU-C 1
ATU-C 2
ATU-C 3
ATU-C 4
ATUC-1
-4DMT
STATUS
ACTIVE
ATU-C 1
ATU-C 2
ATU-C 3
ATU-C 4
ATUC-1
-4DMT
Step 10
Insert the screws through the holes in the lug and the chassis. Use the Phillips-head screwdriver to tighten
the screws and secure the grounding lug firmly to the chassis.
Prepare the other end of the grounding wire and connect it to an appropriate grounding point in your site.
Step 11
Step 12
Repeat

3.2.7 Ground the Third-Party POTS Splitter

Refer to the appropriate vendor documentation for grounding procedures for the third-party
POTS splitter.
Note
Do not ground the components in a rack by chaining them together.
Cisco 6260 Hardware Installation Guide
3-8
System Ground Connection
PEM 1/PEM 2
AUD_CRIT/AU D_MAJ
AUD_MIN/VIS _CRIT
60V
VIS_MAJ/VIS_ MIN
1 A MAX
STAT_ALARM S
BUS_A/BITS_ B
STATUS
STATUS
ACTIVE
ACTIVE
ATU-C 1
ATU-C 1
ATU-C 2
ATU-C 2
ATU-C 3
ATU-C 3
ATU-C 4
ATU-C 4
ATUC-1
ATUC-1
-4DMT
-4DMT
STATUS
STATUS
ACTIVE
ACTIVE
ATU-C 1
ATU-C 1
ATU-C 2
ATU-C 2
ATU-C 3
ATU-C 3
ATU-C 4
ATU-C 4
ATUC-1
-4DMT
ATUC-1
-4DMT
Step 1
through
Step 11
for each Cisco 6260 chassis, as necessary.
Chapter 3
Installing a Cisco 6260 with a POTS Splitter Configuration
Grounding
holes in
side of
Grounding
chassis
lug
OL-2365-02

Advertisement

Table of Contents
loading

Table of Contents